Adjustment of the Molding Parameters

Adjustment of the Molding Parameters
  • Duration: 2 days (14 hours)
  • Language: French or English
  • Place: 15 rue du Dauphiné F-69960 CORBAS
    Quotation on request for a customized session on your site
  • Deadline to access to the training: allow 6 weeks before the course starts.

Details of the course

People concerned:

  • Machine set-up operator
  • Mold set-up operator

Prerequisites:

  • The trainees should have followed the REP Course "Operating an injection press" or have an equivalent level.

Your A3 trainers

Goal of the training:

  • To gain a thorough knowledge of the injection process.
  • Be able to start a new production and adjust the mold
  • Learn how to optimize the process.

 

Content:

Introduction

The rubber

What is rubber?
Rheometry
Flowability
Viscosity
Head losses

The injection press

Reminders

Setting the  parameters of the injection unit 

Temperature
Preparing the compound
Filling the mold
Degassing

Hands-on training in the workshop

Overview of the closing unit

Mechanics
Temperature

Specific machine cycles

Compression - injection

Injection – transfer

Curing 

The CRBs

Assessment of a compound 

TurboCure®

Approach for starting a new mold

Injection molding faults

Faults on the molded part and possible origin

Further  questions 

Conclusion

 


The training will be conducted for a minimum of 4 to a maximum of 8 people.The training will take place in two parts. Theoretical training provided in the classroom, and practical training in the workshop with access to adapted machines and equipment. Please note that the training may be postponed in case of health constraints or absences.
Transportation and accommodation costs in Lyon are not covered by REP. The training courses can be adapted to people with disabilities. Please contact us for the appropriate proposal.

 

Event Information

Event Date 2023-01-03
Event End Date 2032-12-31
Cut Off Date 2032-12-31
Capacity 8
Number Hours 14
Location REP Corbas or on client site
Categories Process and Molds
Attachment 221215_DAP_A3_PRG_EN_PLAQUETTE_PARAMETRES_MOULAGE.pdf