They are conducted by the Process Development team and address to the machine set-up engineers, mold set-up operators, mold designers, mold design draughtsmen, rubber injection plant methods managers who want to learn about molding techniques, mold design or injection process optimization.
Goal of the training:
Duration: 2 days (14 hours)
Goal of the training:
Duration: 2 days (14 hours)
Goal of the training:
Duration: 2 days (14 hours)